Master’s thesis describes the design of a highway bridge over the road II/434 and inundation territory. There are some studies designed, from which the main structure was designed as a prestressed concrete double-girder bridge with 5 spans. Loading, design and assessment of structure is solved according to applicable standards CSN and EN. Calculate the effects of the load are carried in calculation program Scia Engineer 2015. Design and asses are carried only by the manual calculation. The thesis includes used materials, construction process, statically analysis and drawing documentation.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265282 |
Date | January 2017 |
Creators | Šťavík, Jakub |
Contributors | Pachl, Radek, Panáček, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds