Fortum has in a pilot project installed metering equipment with wireless communication in secondary substations in Stockholm. So far, the collected data are used only in specific projects. This master thesis was carried out at Fortum Distribution AB in Stockholm during 2013. The purpose of this study is to simplify and enhance the use of data in for example network planning process, by giving suggestions on how data can be managed and giving examples of analyzes that collected data can be used for. The electricity meter which Fortum has installed is a EDMI-Mk10A which is set to measure max/average/min values with a one hour time resolution of the following parameters: voltage (per phase), current (per phase) andactive power and active and reactive energy. In order to analyze the collected data an analysis tool is required. During this thesis two customized tools in Microsoft Excel have been developed, one for sorting data and one for analyzing. One aim of the thesis is to show examples of what collected measurement data can be used for. This work shows an example of analysis of active power, power factor, voltage, occurrence of interrupts and the relationship between outdoor temperature and power. This master thesis has among others resulted in the following advice: Expand the number of secondary substations with measuring equipment. Higher time resolution. Measure apparent power and temperature.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-226664 |
Date | January 2014 |
Creators | Eklöf, Martin |
Publisher | Uppsala universitet, Elektricitetslära |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | UPTEC ES, 1650-8300 ; 14005 |
Page generated in 0.0012 seconds