Return to search

Kotelna spalující zemní plyn / Gas fired boiler house

This master thesis deals with problems of determining operational and safety risks at gas boiler room in office building with total output of 4×49 kW. The gas boiler room is equipped with four boilers Geminox THRi 10-50. The aim of this master thesis is to determine the potential operational and safety risks of gas boiler room. The master thesis is divided into several parts, when the first part is describing the current situation with some theoretical knowledge and risk analysis. This part also outlines possible solutions for identification and quantification of risks to the gas boiler room. The specific risk factors are determined at other part of master thesis and there is also their analysis, which is solved by cause and effect diagram and by Failure Mode and Effect Analysis. The specific precautions are suggested for chosen risks in final part of master thesis.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:232697
Date January 2012
CreatorsHosnedl, Pavel
ContributorsBaláš, Marek, Skála, Zdeněk
PublisherVysoké učení technické v Brně. Ústav soudního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0023 seconds