It is important to ensure that Transpower is prepared to deliver upcoming transmission tower refurbishment projects that are located on sites with difficult access. This project reviews the availability, capability and cost of utilising alternative construction methods and any associated wider issues. The focus of this report is on how Transpower can more effectively utilise helicopters and gin poles for transmission tower erection and material delivery on remote sites.
Identifer | oai:union.ndltd.org:canterbury.ac.nz/oai:ir.canterbury.ac.nz:10092/8937 |
Date | January 2014 |
Creators | Stevens, David John |
Publisher | University of Canterbury. Management, Marketing, and Entrepreneurship |
Source Sets | University of Canterbury |
Language | English |
Detected Language | English |
Type | Electronic thesis or dissertation, Text |
Rights | Copyright David John Stevens, http://library.canterbury.ac.nz/thesis/etheses_copyright.shtml |
Relation | NZCU |
Page generated in 0.0017 seconds