Return to search

Technologie rekonstrukce žst. Mikulášovice dolní nádraží / Railway Station Mikulášovice dolní nádraží Procedures of Works

This theses aims to propose two alternatives of optimised construction procedures for the reconstruction of the railway station Mikulášovice dolní nádraží. The reconstruction is based on the design provided by Metroprojekt Praha a.s. Each alternative describes suitable mechanization, coordination of works, including needed number of workers, coordination of the works and the total implentation cost analysis. As the thesis deals with reconstruction, it also considers substitute transportation plan. The details are summarized in extensive schedules. The two alernative are compared and evaluated.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455462
Date January 2022
CreatorsŠardická, Klára
ContributorsWrana, Radim, Svoboda, Richard
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0019 seconds