This thesis is devoted to the construction of new waste-to-energy plants in a territory where is already another fossil-fuel power station in operation. The aim is to create a mathematical model and prove that those two devices are able to cooperate effectively using same technology. Exactly assembled model under real operating have characteristics of a mixed integer nonlinear programming. The optimization software GAMS is used for its calculation. The complexity of the model, however, is at a level that solutions in bad initial conditions ends in local optima, or not found at all. This thesis is devoted to the elimination of non-linearity using binary variables and heuristic so the task was solved with acceptable time limits to guarantee an optimal solution.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:254439 |
Date | January 2016 |
Creators | Janošťák, František |
Contributors | Mrázková, Eva, Pavlas, Martin |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds