Return to search

The Establishment of Helicopter Subsystem Design-to-Cost Estimates by Use of Parametric Cost Estimating Models

The purpose of this research was to develop parametric Design-to-Cost models for selected major subsystems of certain helicopters. This was accomplished by analyzing the relationships between historical production costs and certain design parameters which are available during the preliminary design phase of the life cycle. Several potential contributions are identified in the areas of academia, government, and industry. Application of the cost models will provide estimates beneficial to the government and DoD by allowing derivation of realistic Design-to-Cost estimates. In addition, companies in the helicopter industry will benefit by using the models for two key purposes: (1) optimizing helicopter design through cost-effective tradeoffs, and (2) justifying a proposal estimate.

Identiferoai:union.ndltd.org:unt.edu/info:ark/67531/metadc332254
Date08 1900
CreatorsGilliland, Johnny J.
ContributorsBimmerle, Charles F., Spalding, John Barney
PublisherNorth Texas State University
Source SetsUniversity of North Texas
LanguageEnglish
Detected LanguageEnglish
TypeThesis or Dissertation
Formatviii, 194 leaves : ill., Text
RightsPublic, Gilliland, Johnny J., Copyright, Copyright is held by the author, unless otherwise noted. All rights reserved.

Page generated in 0.0019 seconds