Return to search

捲積管制圖之設計 / The design of the convolution chart

量測誤差是工業製程中影響產品值常見的因素。大的量測誤差會使得產品的量測值偏離實際值,並引導監控者至錯誤的結論。本文提出一種新的捲積管制圖。提出指數分配形式的時間間隔型資料,並加上量測誤差的考量,應用在指數加權移動平均管制圖上。此外,假設量測誤差為常態或是指數分配。研究顯示出,在兩種不同分配的量測誤差之下,管制圖的表現都會顯著的受到影響。 / Measurement error is an important factor in industry that influences the outcome of a process. Large measurement error would cause the observation measure deviate from the true value and consequently lead to a wrong decision. In this project, we propose a convolution control chart. We then design the EWMA ‘time between events’ (TBE) control chart with the measurement error, with the assumption that the observations are exponentially distributed. In addition, we assumed the measurement error follows a normal distribution or an exponential distribution. We showed that, in two cases of the measurement error, the performance of the proposed chart monitoring the process mean is greatly affected.

Identiferoai:union.ndltd.org:CHENGCHI/G0098354003
Creators鄭鈞遠, Cheng, Chun-Yuan
Publisher國立政治大學
Source SetsNational Chengchi University Libraries
Language英文
Detected LanguageEnglish
Typetext
RightsCopyright © nccu library on behalf of the copyright holders

Page generated in 0.0055 seconds