The subject of this thesis is focused on analysis of three test workplaces for final inspetion of a stove and determination of a workplace most appropriate for optimization. The thesis includes operating instructions of test equipment and test regulations of appliances that are tested on the production line. The analysis of the operation times was based on data measured in the MORA company and led to an idea of reducing the number of electric stoves positions and guaranteeing the same reliability of testing. The re-measurement of data and the comparison of results has been carried out.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:231025 |
Date | January 2013 |
Creators | Nábělková, Irena |
Contributors | Navrátil, Petr, Kubík, Roman |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds