The aim of this dissertation is to prepare a study of a small hydroelectric power plant as part of the Přelouč navigation level II. The preparation deals with one of the possible variants for the layout design of given constructions. The layout design of a weir with an adjacent lock chamber which secures navigability for the stretch of the Elbe River located between the river kilometers 949,23 and 951,20 near the city of Přelouč in the Pardubice District is also included in the study. The introduction chapter contains the assessment of the environment, which is followed by the specification of the exact placement of the constructions. In the following chapter, a particular type of the hydroelectric power plant machinery is designed based on the available hydrological information and gradient conditions. The final chapter contains the design of the constructional technological layout of an machine room in the form of a technical report and drawing documentation.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:392200 |
Date | January 2019 |
Creators | Bolek, Marek |
Contributors | Roth, Tomáš, Dráb, Aleš |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0015 seconds