Dynamic Modelling and Control of MEA

Greenhouse gas (GHG) emission control has been extensively studied over the past decade. One GHG mitigation alternative is post-combustion carbon dioxide (CO2) capture using chemical absorption, which is a promising alternative due to its proven technology and the relative ease to install on existing coal-fired power plants. Nevertheless, the implementation of commercial-scale CO2 capture plants faces several challenges, such as high energy consumption, commercial availability, and geological CO2 storage. Therefore, there is a great incentive to develop studies that provide insights needed to design and dynamically operate industrial-scale CO2 capture plants for coal-fired power plants.

This work presents a mechanistic dynamic model of a pilot plant of a post-combustion CO2 capture plant using the monoethanolamine (MEA) absorption processes. This model was implemented in gPROMS. The process insights gained from the sensitivity analysis, on six manipulated variables and six potential controlled variables, was used to determine promising control schemes for this pilot plant. This study then proposed three decentralized control structures. The first control scheme was designed based on the traditional-RGA (Relative Gain Array) analysis, whereas the other two control schemes were designed using heuristics. The performance evaluation of those control structures were conducted under eight scenarios, e.g. changes in flue gas composition, set point tracking, valve stiction, reboiler heat duty constraint, and flue gas flow rate. Under the condition where the reboiler temperature is to be controlled, a control scheme obtained from the heuristic showed faster response to achieve the process control objectives (90% CO2 capture rate and 95 mol% CO2 purity in the CO2 product stream) than the RGA-based control scheme.

Furthermore, this study describes a step-by-step method to scale-up an MEA absorption plant for CO2 capture from a 750 MW supercritical coal-fired power plants. This industrial-scale CO2 capture plant consists of three absorbers (11.8 m diameter, 34 m bed height) and two strippers (10.4 m diameter, 16 m bed height) to achieve 87% CO2 captured rate and 95% CO2 purity in the CO2 product stream. It was calculated that the reboiler heat duty of 4.1GJ is required to remove 1 tonne of CO2 at the base case condition (20 kmol/s of flue gas flow rate with 16.3 mol% of CO2). The mechanistic model of an industrial-scale CO2 capture plant including a proposed control structure was evaluated using different scenarios. The performance evaluation result revealed that this plant can accommodate a maximum flue gas flow rate of +22% from the nominal condition due to absorbers??? flooding constraints. Moreover, it is able to handle different disturbances and offers prompt responses (After a plant is disturbed by an external perturbation, control variables in that plant are able to return to their set points in timely fashion using the adjustment of manipulated variables.) without significant oscillating signal or offset. In addition, this study highlights that the poor wetting in the strippers can be avoided by the implementation of a process scheduling, which has not been presented in any publications.

Based on the above, the mechanistic models of CO2 absorption plants and proposed control structures provide insights regarding dynamic behaviour and controllability of these plants. In addition, the industrial-scale CO2 capture plant model can be used for future studies, i.e. integration of power plant and CO2 capture plant, feasibility of plant operation, and controllability improvement.

Identiferoai:union.ndltd.org:LACETR/oai:collectionscanada.gc.ca:OWTU.10012/8128
Date January 2014
CreatorsNittaya, Thanita
Source SetsLibrary and Archives Canada ETDs Repository / Centre d'archives des thèses électroniques de Bibliothèque et Archives Canada
LanguageEnglish
Detected LanguageEnglish
TypeThesis or Dissertation