M. Tech. Business Information Systems / The study aimed at conceptualizing a framework for maximizing Information Systems project maturity. Two factors led to the conception of the study namely, delays in Information Systems project maturity within the South African context and the resultant cost-savings that could be realized from applying appropriate Maturity Models, coupled with the proposed framework, towards reaching project maturity on schedule and on budget. To limit the scope, the South African Weather Service has been selected as the case for the research.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:tut/oai:encore.tut.ac.za:d1001383 |
Date | January 2013 |
Creators | Kgoetiane, Cecil H. |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Text |
Format |
Page generated in 0.0018 seconds