Return to search

Maintenance optimization for power distribution systems

Maximum asset performance is one of the major goals for electric power distribution system operators (DSOs). To reach this goal minimal life cycle cost and maintenance optimization become crucial while meeting demands from customers and regulators. One of the fundamental objectives is therefore to relate maintenance and reliability in an efficient and effective way. Furthermore, this necessitates the determination of the optimal balance between preĀ¬ventive and corrective maintenance, which is the main problem addressed in the thesis. The balance between preventive and corrective maintenance is approached as a multiobjective optimization problem, with the customer interruption costs on one hand and the maintenance budget of the DSO on the other. Solutions are obtained with meta-heuristics, developed for the specific problem, as well as with an Evolutionary Particle Swarm Optimization algorithm. The methods deliver a Pareto border, a set of several solutions, which the operator can choose between, depending on preferences. The optimization is built on component reliability importance indices, developed specifically for power systems. One vital aspect of the indices is that they work with several supply and load points simultaneously, addressing the multistate-reliability of power systems. For the computation of the indices both analytical and simulation based techniques are used. The indices constitute the connection between component reliability performance and system performance and so enable the maintenance optimization. The developed methods have been tested and improved in two case studies, based on real systems and data, proving the methodsā€™ usefulness and showing that they are ready to be applied to power distribution systems. It is in addition noted that the methods could, with some modifications, be applied to other types of infrastructures. However, in order to perform the optimization, a reliability model of the studied power system is required, as well as estimates on effects of maintenance actions (changes in failure rate) and their related costs. Given this, a generally decreased level of total maintenance cost and a better system reliability performance can be given to the DSO and customers respectively. This is achieved by focusing the preventive maintenance to components with a high potential for improvement from system perspective. / QC 20100810

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-4686
Date January 2008
CreatorsHilber, Patrik
PublisherKTH, Elektroteknisk teori och konstruktion, Stockholm : KTH
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageEnglish
TypeDoctoral thesis, comprehensive summary, info:eu-repo/semantics/doctoralThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess
RelationTrita-EE, 1653-5146 ; 2008:012

Page generated in 0.0023 seconds