Return to search

Náhřev a spouštění jaderného bloku Elektrárny Dukovany po odstávce / Warming and Starting Nuclear Unit up of the Dukovany NPP after the Outage

This thesis deals with the analysis of warming and starting up the nuclear unit of Dukovany NPP after the outage. First part explains the various operating modes of nuclear power plants, specifically operating modes of Dukovany NPP. The following part contains the analysis of heat sources in the primary circuit and also the individual production and consumption of steam by the NPP. The next part deals with division into several points of the warming of the Dukovany NPP. The analysis of warming nuclear unit after a outage is made on the basis of the industry based data, measured in December 2015. The result of the analysis is determination the amount of steam passing from a another nuclear unit, which is following by the own proposal of the external steam source.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:242192
Date January 2016
CreatorsLudvík, Lubomír
ContributorsSuk, Ladislav, Katovský, Karel
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.002 seconds