The diploma thesis should identify inconsistencies of the small hydraulic power plant Katovice. The fountain water turbine is now running in slower delivery because the original Francis high speed turbine achieved much smaller flow than a Kaplan type turbine. The aim of the thesis is a project of a spiral case and a distributor for the Kaplan turbine, which should work in higher flow and should be run in its optimum. This project will serve as a base for construction of distributor and spiral case for the small hydraulic power plant Katovice.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:228748 |
Date | January 2009 |
Creators | Čípa, Jiří |
Contributors | Veselý, Jindřich, Haluza, Miloslav |
Publisher | Vysoké učení technické v Brně. Fakulta strojního inženýrství |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds