The aim of this master thesis was to measure and evaluate shifts of rail strip and deck of the bridge in the 0,206 km route Zábřeh - Bludov across the river Moravská Sázava. The measurement was performed by classical geodetic methods. The result of the study was evaluation of the three periods of deformation measurements and numerical and graphical documentation. Shifts were caused especially by changes in temperature and operational effects.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226602 |
Date | January 2014 |
Creators | Suchánek, Zbyněk |
Contributors | Bureš, Jiří, Švábenský, Otakar |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds