Return to search

Sportovní centrum / Sports center

The new building sport center without cellar. The object is based on strip foundation. The footing bottom is in frost resistant depth. Construction system is in both ways. Vertical walls are made by cut bricks POROTHERM. The external cladding is replenished by thermal insulation plaster POROTHERM TO. Horizontal constructions are made by filigree ceiling panels. Stairway is made by reinforced concrete. Heating system is ensured by gas boiler.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227216
Date January 2015
CreatorsHlaváček, Petr
ContributorsPíštěk, Rostislav, Daněk, Lukáš
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.002 seconds