Return to search

Rekonstrukce předpjatého železničního mostu / The reconstruction of the prestressed railway bridge

Diploma thesis describes the design of main structure reinforcement of the railway bridge ,,Gagarin’’ in the 5,872 km of route Český Těšín – Ostrava Kunčice. Reinforcement is achieved by combination of composite slab-shaped channel with the continuous gravel ballast and free additional prestressing cables. There are 3 variants for which the design and assessment of main structure is performed. Evaluation of the options is performed on basis of calculations. There are made additional calculations and drawings for best variant.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226961
Date January 2014
CreatorsMacková, Lucie
ContributorsŠedivý, Jan, Klusáček, Ladislav
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0016 seconds