Return to search

Návrh nového systému balancování montážních linek dveřních pohonů kolejových vozidel / New system proposal for the balancing of assembly line powered door operation of rail vehicles

This work deals with the measurement time frames and then balancing of assembly line in the company IFE-CR in segment drive units rail vehicles. The first part of thesis is focused on methods of work measurement, method improving quality eight disciplines problem solving and one of the many basic methods lean production 5S. The second part of thesis is introducing company, company's history, products and distribution drive units for rail vehicles. The following part is focused a distribution of production hall, description of workplaces and detailed description of assembly line. The practical part is focused on time frames of assembly operations and theirs compare before and after balancing of assembly line. The last part of the thesis deals evaluation of results balancing of assembly line with focus on productivity.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:231406
Date January 2014
CreatorsKolečkář, Jan
ContributorsZemčík, Oskar, Kubík, Roman
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0022 seconds