Return to search

Modifikace materiálového toku výrobní linky / Modification of material flow for a production line

The main aim of this master´s thesis is the analysis and design of internal supply production lines in the company Edscha Automotive Kamenice s.r.o. The company manufactures components for the automotive industry. Internal material flow are mapping and described in chapter 3. This chapter describes the current state of supply buffers on production lines. Buffers are supplying by small materials. Next part of this work is describing the method of removal of finished production and using system Kanban in company. Chapter 4 of this thesis is devoted to the design part. The design part is first described the creation of models in Excel and MS software Tecnomatix Plant Simulation. Subsequently they are compiled proposals for the supply of production lines, small material and transport the finished products. Proposals in this part evaluated and a recommendation for implementing into operation. This proposal is then simulated in software Tecnomatix Plant Simulation and compared with the current situation. It is also determined by the number of handlers on the functioning of material flow. Furthermore, they are given further suggestions for improvements, some of which require a little change in the current system Kanban and supply.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:241898
Date January 2016
CreatorsZadák, Zdeněk
ContributorsJelínek, Oldřich, Kašpárek, Jaroslav
PublisherVysoké učení technické v Brně. Fakulta strojního inženýrství
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.3192 seconds