A new way of looking at scheduling and lot sizing is proposed by embedding material handling considerations in the determination of optimum delivery policies for a single stage, uniform demand assembly system in a finite horizon. Unit loads are used in place of lots; material handling and container costs are charged; and area and material handling constraints are imposed. A solution procedure based on a delivery period matrix is used to solve the minimization problem. Computational experience is provided. A special case of uniform delivery intervals is taken up and a discussion is given on variance penalty. / M.S.
Identifer | oai:union.ndltd.org:VTETD/oai:vtechworks.lib.vt.edu:10919/94444 |
Date | January 1983 |
Creators | Occeña, Luis G. |
Contributors | Industrial Engineering and Operations Research |
Publisher | Virginia Polytechnic Institute and State University |
Source Sets | Virginia Tech Theses and Dissertation |
Language | en_US |
Detected Language | English |
Type | Thesis, Text |
Format | viii, 136 leaves, application/pdf, application/pdf |
Rights | In Copyright, http://rightsstatements.org/vocab/InC/1.0/ |
Relation | OCLC# 11057114 |
Page generated in 0.0021 seconds