Submitted by Maicon Juliano Schmidt (maicons) on 2015-04-01T15:36:14Z
No. of bitstreams: 1
Rafael Pieretti de Oliveira.pdf: 3388474 bytes, checksum: e72d643abe55c81d631b660ecefa28c4 (MD5) / Made available in DSpace on 2015-04-01T15:36:14Z (GMT). No. of bitstreams: 1
Rafael Pieretti de Oliveira.pdf: 3388474 bytes, checksum: e72d643abe55c81d631b660ecefa28c4 (MD5)
Previous issue date: 2013-02-28 / Nenhuma / Esta dissertação apresenta uma proposta de método para dimensionamento e gestão de linhas de montagem em boxes operadas por equipes. O método é proposto visando abordar e integrar o Sistema Toyota de Produção (STP) e a Teoria das Restrições (TOC). Esta pesquisa utiliza como base metodológica o Design Research, onde encontra-se estruturado em cinco fases: i) conscientização do problema; ii) sugestão; iii) desenvolvimento do artefato; iv) avaliação; e v) conclusão. O método sugerido para dimensionamento e gestão de linhas de montagem operadas por equipes consiste em 22 etapas: duas etapas preliminares: montagem da equipe de implementação e treinamento da equipe de implementação; duas etapas de Demanda: o que a linha vai produzir e qual a demanda a ser atendida, calculo do takt time; cinco etapas de Oferta: qual o fluxo atual dos produtos na linha, detalhamento das operações, quantas pessoas farão parte da linha, definição dos boxes de trabalho, e divisão das atividades/trabalho nos boxes; uma de comparação do takt time x tempo de ciclo: a linha terá condições de atender a demanda prevista (Takt > TC); definição da estratégia de melhoria do gargalo; estratégia para redução dos custos de produção da linha; qual a documentação do projeto; definição dos indicadores de desempenho da linha; método de trabalho na linha; operacionalização da linha de montagem; e gerar ações para solucionar problemas. O desenvolvimento e avaliação do artefato foram realizados em uma empresa fabricante de carretas localizada na cidade de Caxias do Sul. / This thesis presents a proposal for a method to dimension and manage assembly lines in boxes operated by teams. The method aims to approach and integrate Toyota Production System (TPS) and Theory of Constraints (TOC). This research uses Design Research as methodological basis, and is structured in five phases: i) problem awareness ; ii) proposal, iii) artifact development; iv) evaluation; and v) conclusion. The method proposed to dimension and management of assembly lines operated by teams consists of 22 steps: two preliminary steps: implementation team structure and training; two steps of demand: what the line will produce and what demand will be met, takt time calculation; five steps of supply: what the current flow is of the products on the line, operations detailing, how many people will be part on the line, boxes definition and activities in the boxes; one step of takt time x cycle time comparison: if the line meets the previewed demand (Takt> TC); bottleneck strategy definition; cost production strategy of the product; what the project documentation is; indicators definition; work method on the line; assembly line operationalization; and actions to solve problems. The development and evaluation of the artifact were done in a company that assemblies road implements in the city of Caxias do Sul.
Identifer | oai:union.ndltd.org:IBICT/oai:www.repositorio.jesuita.org.br:UNISINOS/3222 |
Date | 28 February 2013 |
Creators | Oliveira, Rafael Pieretti de |
Contributors | http://lattes.cnpq.br/2828871234344046, Antunes Júnior, José Antonio Valle |
Publisher | Universidade do Vale do Rio dos Sinos, Programa de Pós-Graduação em Engenharia de Produção e Sistemas, Unisinos, Brasil, Escola Politécnica |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Repositório Institucional da UNISINOS, instname:Universidade do Vale do Rio dos Sinos, instacron:UNISINOS |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0019 seconds