Return to search

Komorový most / Box girder bridge

The subject of this thesis is the design of a prestressed box girder construction with several spans. Two variants are designed and for detailed solving was chosen the variant of the box girder. The length of loadbearing structure is 212 m, the longest span has 60 m. The calculation of load effects is done by software Scia Engineer 19.1. Drawing part is done by software Allplan Engineering 2021. The thesis includes drawings, representation of the construction proces, visualization and a structural design. Designing and assessments were made according to currently valid European standarts.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:433249
CreatorsVostal, Lukáš
ContributorsPecha, Jakub, Nečas, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0014 seconds