The purpose of this thesis is to design bridge over the valley on D1 highway. Length of the structure is 170 meters. Main structure is four spans prestressed beam. The length of fields is 36+48+48+36 meters. The structure is examined in all phases of construction, including the operating phase according to valid standards.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227605 |
Date | January 2015 |
Creators | Kopřiva, Jan |
Contributors | Nováček, Jan, Zich, Miloš |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds