Return to search

Most přes přeložku silnice I/46 / The bridge across the relocation of road I/46

The topic of the thesis is safe and economical design of a bearing bridge structure according to valid regulations and standards. The structure is reviewed by limit states of ultimate and serviceability. The solution includes time dependent analysis of the structure.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:239998
Date January 2016
CreatorsHurta, Adam
ContributorsPozdíšek, Jan, Nečas, Radim
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0014 seconds