The object of this diploma thesis is the design and review of a bridge on a ramp. The bridge is part of a junction between the expressway R35 and the highway D1. Three case studies were made. The bridge construction is solved as continuous beam with six spans. The resulting design was made of prestressed concrete according to valid standards. The gradual construction was taken into consideration.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227659 |
Date | January 2015 |
Creators | Páteček, Tomáš |
Contributors | Pachl, Radek, Panáček, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds