Return to search

Sportovní centrum Brno / Sport Centre Brno

It is an object of sports equipment, which will be mainly used for ice hockey, as well as for the organization of other sporting and social events. The main objective in the design of architectural buildings were to meet modern requirements for the operation and use of the sports hall. Mass solution hall is designed as part of a hyperbolic curve, which rotates around a central axis. This substance is added next curve and along the perimeter. It is a sine wave, which is twice reflected on the mass of the object. This curve separates the roofing structure from the construction and glazing adds mass element dynamics, which is in my opinion the sporting character of the buildings needed. Construction is due to this curve seems to be constantly moving. This curve has another purpose and that the highest point of the curve are a total of two, is the main entrances to the building and the curve that creates a kind of "entry portal".

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:225852
Date January 2013
CreatorsZaplatil, David
ContributorsVostrejž, Dušan, Odvárka, Antonín
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.002 seconds