It is an object of sports equipment, which will be mainly used for ice hockey, as well as for the organization of other sporting and social events. The main objective in the design of architectural buildings were to meet modern requirements for the operation and use of the sports hall. Mass solution hall is designed as part of a hyperbolic curve, which rotates around a central axis. This substance is added next curve and along the perimeter. It is a sine wave, which is twice reflected on the mass of the object. This curve separates the roofing structure from the construction and glazing adds mass element dynamics, which is in my opinion the sporting character of the buildings needed. Construction is due to this curve seems to be constantly moving. This curve has another purpose and that the highest point of the curve are a total of two, is the main entrances to the building and the curve that creates a kind of "entry portal".
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:225852 |
Date | January 2013 |
Creators | Zaplatil, David |
Contributors | Vostrejž, Dušan, Odvárka, Antonín |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds