Law Pui Yin, Kathy. / "Architecture Department, Chinese University of Hong Kong, Master of Architecture Programme 2009-2010, design report." / "May 2010." / Includes bibliographical references (p. [102]-103). / 01 / BACKGROUND / Introduction / Case Study - Political Borders / HKSZ Border Future Speculation (Timeline Study) / Criticisms on HK Government / ISSUE / Interface / Urban Polarity / PROGRAM / Program Research / Program Proposal (Whole Border) / 02 / SITE / Site Selection / Site Planning / 03 / DESIGN CONCEPT / Case Study - Habitable Bridge / Case Study - River as a Physical Border / Design Concept / the DESIGN / Situated At Site / Program / Terraces / Types of Space / Types of Space: Truss BoxPartition / 04 / REFERENCE
Identifer | oai:union.ndltd.org:cuhk.edu.hk/oai:cuhk-dr:cuhk_326685 |
Date | January 2010 |
Contributors | Law, Pui Yin., Chinese University of Hong Kong Graduate School. Division of Architecture. |
Source Sets | The Chinese University of Hong Kong |
Language | English |
Detected Language | English |
Type | Text, bibliography |
Format | print, 103 p. : ill. (some col.), maps (some col.), plans (some col.) ; 22 x 30 cm. |
Coverage | China, Hong Kong, China, Hong kong, Lo Wu (Hong Kong, China) |
Rights | Use of this resource is governed by the terms and conditions of the Creative Commons “Attribution-NonCommercial-NoDerivatives 4.0 International” License (http://creativecommons.org/licenses/by-nc-nd/4.0/) |
Page generated in 0.002 seconds