Approved for public release; distribution is unlimited / Maintaining the Fleet Readiness Plan (FRP) construct of six aircraft carriers available within 30 days, plus two additional carriers available within 90 days is a difficult task. Maintenance requirements on carriers alone make satisfying the FRP a challenging scheduling problem. We develop a carrier maintenance scheduling model with a goal to meet, as best as possible, the FRP requirements over a ten-year period, while obeying simple maintenance facility constraints. This model allows us to anticipate gaps in coverage and also quantitatively assess the benefit, or burden, of re-sizing the fleet. We conclude that by increasing the average cycle time for a Carrier Strike Group (CSG) to 27 months we can meet the FRP requirements continuously after an initial maintenance adjustment period of 62 months. / Lieutenant, United States Navy
Identifer | oai:union.ndltd.org:nps.edu/oai:calhoun.nps.edu:10945/1415 |
Date | 09 1900 |
Creators | Hall, Matthew H. |
Contributors | Carlyle, W. Matthew, Kline, Jeffrey E., Naval Postgraduate School (U.S.)., Operations Research |
Publisher | Monterey, California. Naval Postgraduate School |
Source Sets | Naval Postgraduate School |
Detected Language | English |
Type | Thesis |
Format | xvi, 69 p. : ill. (some col.), col. maps ;, application/pdf |
Rights | This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States. |
Page generated in 0.0012 seconds