International Telemetering Conference Proceedings / October 22-25, 2001 / Riviera Hotel and Convention Center, Las Vegas, Nevada / For every space mission, there are challenges with the launch site/field operations process that are addressed too late in the development cycle. This potentially causes schedule delays, cost overruns, and adds risk to the mission success. This paper will discuss how a single interface, representing the payload at the launch site in all phases of development, will mitigate risk, and minimize or even alleviate potential problems later on. Experience has shown that a single interface between the project and the launch site allows for issues to be worked in a timely manner and bridges the gap between two diverse cultures.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/607692 |
Date | 10 1900 |
Creators | Catena, John, Gates, Donald, Jr., Blaney, Kermit, Jr. |
Contributors | National Aeronautics and Space Administration, Omitron, Inc. |
Publisher | International Foundation for Telemetering |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright © International Foundation for Telemetering |
Relation | http://www.telemetry.org/ |
Page generated in 0.002 seconds