Return to search

Optimalizace výroby lepených hranolů na závodě Stora Enso WP HV, s.r.o. ve Ždírci nad Doubravou

This deals with possibilities of optimisation finger joint construction timber production line in Stora Enso WP HV s.r.o. in Ždírec nad Doubravou. The thesis was based on Stora Enso requirements which were found earlier and the thesis suggest solutions of these problems. The solutions of problems were designed in three areas. In first there was solved profit from buying better sorted timber in relation between price of timber and yield of the timber. The next interest was continuity between two main operations, cutting and joint milling. These two operations are in close relation and there was identified conditions for formation downtimes. The method for avoiding downtimes was based on decreasing quantity of cuts. The last of thesis was about possibility to use automatic grading machine for classifying wood defects. For automatic grading machine was designed placement in or out of production line and its opportunities.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:362043
Date January 2016
CreatorsRůžička, Dominik
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0027 seconds