The thesis deals with the variant design of the steel structure of single-track railway bridge on the line Tišnov – Nové Město na Moravě. The task is bridging the local road by a bridge structure with one field. Length of the bridge is 40 m.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:240335 |
Date | January 2016 |
Creators | Olbert, Jan |
Contributors | Štrba, Michal, Brosch, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds