The aim of this thesis is description of critical situations in the electrical grid and the consequences which can be caused by these situations. Further possibilities of voltage recovery and ways how to reach the needed voltage are described. Another part is firstly about regulation electrical system and resources which are connected to this system. Secondly there is appraisal of possibility of connection new resource into distribution system 110 kV and conditions of connection new resources. The result of the thesis is description voltage recovery and the rules which have to be kept during critical situations.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220176 |
Date | January 2013 |
Creators | Wasserbauer, Vojtěch |
Contributors | Vaculík, Petr, Toman, Petr |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds