The work focuses on outlet of the electrical power from power plants operating in urban areas. After a short analysis of the general possibility of leading out electric power from power plants of various types, thesis continues to describe of outlet electrical power from PPC Červený Mlýn. Subsequently, are calculated short-circuit conditions in the main switching station. It follows an analysis of power lines. The last part dealt with the issue of reliability of sources in connection with random transition processes in the electrical network and the light of the operational reliability of electrical power equipment.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:219418 |
Date | January 2012 |
Creators | Hrubý, Radek |
Contributors | Brno,, Luděk Ondroušek - Teplárny, Matoušek, Antonín |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0023 seconds