This thesis deals with a design of the bridge for highway D47 crossing the valley. From three alternative solution is chosen solution of a double-girder. The longitudinal direction of the structure is designed as eight span structure. The lenght of the spans is 25 + 6 x 35 + 25 m. Detailed design of the structure selected variants of the bridge is carried out according to limit states including consideration of the impact of construction on the bridge of his design. static model is carried out as a whip. It is elaborated a detailed structural analysis and it is developed drawings and visualization of the bridge.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226426 |
Date | January 2013 |
Creators | Repta, Michal |
Contributors | Jurík, Michal, Panáček, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds