Return to search

Statické zajištění zámku / Static provision of castle

The aim of this final thesis was static protection for castle in Miroslavské Knínice. It was necessary to explore several respects and find signs of violation. Next analyze and propose suitable assurance of individual parts. Separe into the stages of construction and to consider the proposal in terms of ensuring the resistance of materials. Finally create a detailed documentation in the range suitable for performance. Based on engineering geology and visual survey was designed horizontal bracing prestressing cables at three levels. The first level "A" consists of a closed circuit of prestressed reinforced concrete passports, supplemented by the cross and construction of prestressed reinforced concrete passports. Next level "B,C" is used to secure the top of the building. Levels “B,C” are proposed using prestressed cable in spare cable channels.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:240358
Date January 2016
CreatorsKulla, Lukáš
ContributorsBažant, Zdeněk, Strnad, Jiří
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0019 seconds