Return to search

A Study on feedback influence of performance index of the Balanced Scorecard Strategy with system dynamics - Take private Fixed Network Company as an example

The introduction of the Strategy Maps cooperate with the Balanced Scorecard(BSC) of Kaplan and Norton of 2003, the application and studying more and more on the practice and academy. In some papers mention the current BSC theory of the limit; there are no any research of interaction influence relation in BSC, Strategy goal, Performance Index and taking action etc. But it is the complicated dynamics relation between the BSC strategy action and the internal process of organization. Most of managers often pays close attention to neglecting the strategy goal long-termly in a short time, the side effect and sequelae caused by the fact that take action in strategy are influenced, form and judge the situation which feedbacks information by accident even more, namely the one that cause strategy planning is improper, then make the push benefit of the strategy goal not so good as expectancy. It can solve the problem of dynamic, If combine in BSC with the system dynamics method.
Interaction mechanism and method of probing into enterprise's strategy goal and performance while measuring that the purpose of this research is here, draw the strategy map and weigh the goal and weigh the causality of the project with enterprises, Set up system dynamics model in accordance with its causality, analyze the result observed in simulation, find out the factor that drive succeeds, select the key index needed in order to finish the strategy goal. The main purpose, (1) to set up: The expansion of strategy map and Balanced Scorecard, and utilize the system dynamics method to carry on planning, simulation, procedure and tests. (2) To analyze: Through the interaction simulation of the test between performance index and strategy goal, looking for the best key performance index and the revise of policy and strategy.
The research approach adopts the system dynamics method mainly, the materials which carry on case study are collected and analyzed; ' The procedure of planning, design and measurement of enterprise's strategy goal ' utilizing this research to be put in order, by the expansion of the strategy map and Balanced Scorecard, carry on the setting-up, simulation, test and analyzing of the system dynamic model. Use to propose the conclusion of this research.
Study the conclusion: (1) with the causality of the BSC strategy goal project, there is influence of side effect and sequelae. (2) Imitate the execution achievement of the BSC strategy goal action scheme with the system dynamics method, can be the reference for policy planning and adjustment of the strategy. (3) With the side effect in the strategy goal causality of the Balanced Scorecard, support to conclude the performance index measurement. (4) Utilize the simulate test of system dynamics, look for the leading index in the system. (5) Study and put in order the basic system dynamics model of Balanced Scorecard. Expect that enterprises can use system dynamic to improve the whole benefit for a long time of enterprise's strategy goal to organize effectively. Lastly, to address the research result that in meaning on of managing, study limitation and the suggestion with follow-up research.

Identiferoai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0630105-185210
Date30 June 2005
CreatorsHuang, Chao-Jen
ContributorsChang-yung Liu, Ya-Tsai Tseng, Yi-Min Tu, Showing Young
PublisherNSYSU
Source SetsNSYSU Electronic Thesis and Dissertation Archive
LanguageCholon
Detected LanguageEnglish
Typetext
Formatapplication/pdf
Sourcehttp://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0630105-185210
Rightswithheld, Copyright information available at source archive

Page generated in 0.0021 seconds