Return to search

Planejamento energético da operação de médio prazo conjugando as técnicas de PDDE, PAR(p) e Bootstrap

Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-06-22T12:09:45Z
No. of bitstreams: 1
cristinamarciabarrosdecastro.pdf: 9219339 bytes, checksum: 92fbbaf80500b5c629a4e62bcd9aa49d (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-07-13T15:29:14Z (GMT) No. of bitstreams: 1
cristinamarciabarrosdecastro.pdf: 9219339 bytes, checksum: 92fbbaf80500b5c629a4e62bcd9aa49d (MD5) / Made available in DSpace on 2016-07-13T15:29:14Z (GMT). No. of bitstreams: 1
cristinamarciabarrosdecastro.pdf: 9219339 bytes, checksum: 92fbbaf80500b5c629a4e62bcd9aa49d (MD5)
Previous issue date: 2012-12-27 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / Com o objetivo de atendimento à demanda de energia elétrica, buscando um baixo custo na geração de energia, é imprescindível o desenvolvimento do planejamento da operação do setor elétrico brasileiro. O planejamento da operação no horizonte de médio prazo leva em consideração a alta estocasticidade das afluências e é avaliado através da série histórica de Energia Natural Afluente (ENA). No modelo homologado pelo setor, o estudo da ENA tem sido feito por meio da metodologia Box e Jenkins, para determinar os modelos autorregressivos periódicos (PAR(p)), bem como sua ordem . Aos resíduos gerados na modelagem do PAR(p), são aplicados uma distribuição lognormal três parâmetros, como forma de gerar séries sintéticas hidrológicas semelhantes à série histórica original. Contudo, a transformação lognormal incorpora não linearidades que afetam o processo de convergência da Programação Dinâmica Dual Estocástica (PDDE). Este trabalho incorpora a técnica de bootstrap para a geração de cenários sintéticos que servirão de base para a aplicação da PDDE. A técnica estatística Bootstrap é um método alternativo a ser empregado ao problema de planejamento e que permite tanto determinar a ordem ( ) do modelo PAR(p), quanto gerar novas séries sintéticas hidrológicas. Assim, o objetivo do trabalho é analisar os impactos existentes com o uso do Bootstrap no planejamento da operação dos sistemas hidrotérmicos e, em seguida estabelecer uma comparação com a metodologia que tem sido aplicada no setor. Diante dos resultados foi possível concluir que a técnica bootstrap permite a obtenção de séries hidrológicas bem ajustadas e geram resultados confiáveis quanto ao planejamento da operação de sistemas hidrotérmicos, podendo ser usada como uma técnica alternativa ao problema em questão. / Aiming to match the long term load demand with a low cost in power generation, it is very important to improve more and more the operation planning of the Brazilian electric sector. The operation planning of medium/long term takes into account the water inflows, which are strongly stochastic, and it must be evaluated using the series of Natural Energy Inflows (NEI). In the current computational model applied to Brazilian operation planning of medium/long term, the study of ENA has been done by Box and Jenkins methodology, which determines the periodic autoregressive model (PAR (p)), as well as its order p. A lognormal distribution with three parameters is applied on the residues that are created by the PAR (p) model, as a way to generate synthetic hydrologic series similar to the original series. However, this lognormal transformation brings nonlinearities which can disturb the stability and convergence of Stochastic Dual Dynamic Programming (SDDP). This thesis incorporates the bootstrap technique to create synthetic scenarios which will be taken into account as a basis for the SDDP implementation. This statistical technique, called bootstrap, is an alternative method used to determine both the order (p) of the model PAR (p), and, after that, to produce synthetic hydrological series. Thus, the objective of this thesis is to analyze the impact of the Bootstrap technique compared to the current methodology. The results showed that the bootstrap technique is suitable to obtain adherent hydrological series. So, it was created reliable scenarios regarding the planning of the operation of hydrothermal systems. Finally, this new methodology can be used as an alternative technique to long term hydrothermal planning problems.

Identiferoai:union.ndltd.org:IBICT/oai:hermes.cpd.ufjf.br:ufjf/1876
Date27 December 2012
CreatorsCastro, Cristina Márcia Barros de
ContributorsMarcato, André Luís Marques, Souza, Reinaldo Castro, Faria Junior, Haroldo de, Dias, Bruno Henriques, Oliveira, Edimar José de, Passos Filho, João Alberto
PublisherUniversidade Federal de Juiz de Fora, Programa de Pós-graduação em Engenharia Elétrica, UFJF, Brasil, Faculdade de Engenharia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis
Sourcereponame:Repositório Institucional da UFJF, instname:Universidade Federal de Juiz de Fora, instacron:UFJF
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0029 seconds