The focus of this report and the study for which it was written involves two specific types of user charges: Building permit fees are fees that cover the cost of administering the document (the building permit) and the cost of inspecting the construction for which the permit was issued. This report examines the issues, both legal and procedural, surrounding regulatory fees and their effects on building fees within the City of San Bernardino. As elements of the larger study, various smaller studies such as time and motion studies of the building inspector's activities and fully Burdened Hourly Rate Study were completed.
Identifer | oai:union.ndltd.org:csusb.edu/oai:scholarworks.lib.csusb.edu:etd-project-4333 |
Date | 01 January 2007 |
Creators | Dohm, John Carl |
Publisher | CSUSB ScholarWorks |
Source Sets | California State University San Bernardino |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | Theses Digitization Project |
Page generated in 0.0018 seconds