This master’s thesis solves the lean production’s methods implementation in the steps assembly department at the company IFE CR, a. s. The first part of the thesis describes the material and information flows and the most serious problems are identified in this part. On the basis of the analysis the optimized future state is designed and possible proposals of solutions are recommended to do for achieving this state. The solution of implementation of a new steps assembly line is solved in detail in the last part.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:222080 |
Date | January 2009 |
Creators | Hajný, Petr |
Contributors | Chorovský, Igor, Jurová, Marie |
Publisher | Vysoké učení technické v Brně. Fakulta podnikatelská |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds