Simulação de operação de reentrada em poços sob águas ultra-profundas : uma proposta para o controle de aproximação do BOP / Simulation of reentry operation into well in ultra-deep water : proposal to control the BOP approach

Orientador: Celso Kazuyuki Morooka / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecânica e Instituto de Geociências / Made available in DSpace on 2018-08-29T00:17:50Z (GMT). No. of bitstreams: 1
Yamamoto_Marcio_M.pdf: 8268362 bytes, checksum: d7360bb0a9c0c1aed1900c2637804300 (MD5)
Previous issue date: 2007 / Resumo: Para a perfuração de poços de petróleo sob águas ultra-profundas (acima de 1500 m de profundidade), é necessária a instalação na cabeça do poço do equipamento de segurança do poço chamado de Preventor de Erupção, ou BOP. Este equipamento é descido pendurado pelo riser de perfuração, e esta operação é conhecida como Reentrada no Poço. Durante a aproximação do BOP ao poço, o equipamento é mantido suspenso sobre a cabeça do poço através do riser de perfuração, e a extremidade superior do riser fica engastada na plataforma flutuante de perfuração. Nesta dissertação de mestrado, a análise dinâmica dos dois sistemas dinâmicos acoplados (riser e plataforma) é realizada através de simulação numérica no domínio do tempo. Um programa computacional foi desenvolvido, que emprega um modelo não-linear para a dinâmica da plataforma flutuante e outro modelo utilizando o Método dos Elementos Finitos para a dinâmica do riser. O sistema de Posicionamento Dinâmico (DP) da plataforma, que é responsável em manter a posição da plataforma dentro de um raio de tolerância sobre a cabeça do poço, também foi incluído no modelo numérico. Um sistema de controle realimentado para controlar a aproximação do BOP à cabeça do poço é proposto. Discussões a respeito da otimização do controle realimentado a fim de minimizar o tempo gasto para a reentrada do poço são realizadas / Abstract: During the drilling of petroleum wells in ultra-deep water (more than 1500 m of water depth), it is necessary to assembly a piece of safety equipment called Blowout Preventer, or BOP, on the wellhead. The BOP is lowered hung by the drilling riser; this installation operation is called the Reentry Operation. During the well approach, the BOP is kept suspended above the wellhead by the drilling riser, and the upper end of the riser is fixed at the rig floor of the floating platform rig. In this work, the analysis of the dynamics of the coupled system (platform and riser) is carried out using numerical simulation in the time domain; the software was developed using a nonlinear model for the floating platform dynamics and the Finite Element Method for the riser dynamics. The Dynamic Positioning (DP) system, that keeps the platform position into a tolerance radius on the wellhead position, is also included in the numerical simulation. A feedback control system that controls the BOP approach is proposed. Discussions are carried out on the feedback control system which is developed to reduce the operational time of the reentry operation / Mestrado / Explotação / Mestre em Ciências e Engenharia de Petróleo

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.unicamp.br:REPOSIP/265718
Date29 August 2018
CreatorsYamamoto, Márcio
ContributorsUNIVERSIDADE ESTADUAL DE CAMPINAS, Morooka, Celso Kazuyuki, 1958-, Donha, Décio Crisol, Serpa, Alberto Luiz, Bordalo, Sérgio Nascimento
Publisher[s.n.], Universidade Estadual de Campinas. Faculdade de Engenharia Mecânica, Universidade Estadual de Campinas. Instituto de Geociências, Programa de Pós-Graduação em Ciências e Engenharia de Petróleo
Source SetsIBICT Brazilian ETDs
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Format118 p. : il., application/pdf
Sourcereponame:Repositório Institucional da Unicamp, instname:Universidade Estadual de Campinas, instacron:UNICAMP
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0118 seconds