The main concern of this thesis is to design heating system for 5 storey apartment building in two alternatives of heat source - with a heat pump and with traditional gas boiler. Both applications are connected to two-pipes distribution system in building using the low-temperature water and radiators. The proposal takes account of the the production of hot water. The one of aims is to compare both variants also from the economic point of view. The experimental part is divided into two parts. The first part deals with the obligation to control efficiency of boilers, imposed by the Energy efficiency law No. 177/2006 Co. and § 6, sect. 2 - 5 and related regulation No. 276/2007 Co. The second part deals with the assessment of monitored room for proper regulation of the heating system.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:225581 |
Date | January 2012 |
Creators | Dufek, Martin |
Contributors | Adam, Pavel, Hirš, Jiří |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.1884 seconds