Sixteen "model building" and "model selection" procedures commonly encountered in industry, all of which were initially alleged to be capable of identifying the best model from the collection of 2k possible linear models corresponding to a given set of k predictors in a multiple linear regression analysis, were individually summarized and subsequently evaluated by considering their comparative advantages and limitations from both a theoretical and a practical standpoint. It was found that none of the proposed procedures were absolutely infallible and that several were actually unsuitable. However, it was also found that most of these techniques could still be profitably employed by the analyst, and specific directional guidelines were recommended for their implementation in a proper analysis. Furthermore, the specific role of the analyst in a multiple linear regression application was clearly defined in a practical sense.
Identifer | oai:union.ndltd.org:UTAHS/oai:digitalcommons.usu.edu:etd-7974 |
Date | 01 May 1972 |
Creators | Jensen, David L. |
Publisher | DigitalCommons@USU |
Source Sets | Utah State University |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | All Graduate Theses and Dissertations |
Rights | Copyright for this work is held by the author. Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the copyright owners. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user. For more information contact digitalcommons@usu.edu. |
Page generated in 0.0022 seconds