Energy retrofits can be executed by a building owner with or without the supervision of a third-party agent. We define process models to capture third-party energy retrofit inspection activities, and refine, augment, and generalize those models to then examine the impact of third-party retrofit inspections. Buildings included in the study vary considerably in type, and so do retrofit programs applied to those buildings.
Identifer | oai:union.ndltd.org:GATECH/oai:smartech.gatech.edu:1853/53891 |
Date | 21 September 2015 |
Creators | Szymkiewicz, Paul M. |
Contributors | Augenbroe, Godfried |
Publisher | Georgia Institute of Technology |
Source Sets | Georgia Tech Electronic Thesis and Dissertation Archive |
Detected Language | English |
Type | Thesis |
Format | application/pdf |
Page generated in 0.0015 seconds