Return to search

PROJETO ABC PIRAMBU EM FOCO: AVALIAÃÃO DA POLÃTICA DE COGESTÃO DO GOVERNO DO ESTADO DO CEARÃ. / ABC Pirambu PROJECT FOCUS: EVALUATION OF POLICY Co-management of the State Government of CearÃ

nÃo hà / Este trabalho à um relato dos resultados da avaliaÃÃo da polÃtica de cogestÃo do
governo do Estado do CearÃ, tendo como objeto de estudo as aÃÃes desenvolvidas
pelo Projeto ABC - Pirambu, no ano de 2009. Os efeitos da pobreza nos bairros
perifÃricos de Fortaleza levaram o Poder PÃblico a ampliar as suas aÃÃes no sentido
de minimizar os resultados negativos dessa problemÃtica, adotando uma polÃtica de
parceria com a sociedade civil. O Governo do Estado do CearÃ, por meio da
Secretaria do Trabalho e Desenvolvimento Social (STDS), associando-se a
organizaÃÃes da sociedade civil, representativas das comunidades e bairros
perifÃricos de Fortaleza, em sistema de cogestÃo, buscou a participaÃÃo e divisÃo da
responsabilidade, na soluÃÃo dos problemas vivenciados pela populaÃÃo,
implementando o Projeto ABC em 18 pontos cruciais da periferia da capital
fortalezense, em busca de atender a crianÃas e adolescentes, na faixa etÃria de 6 a
17 anos, que se encontram em situaÃÃo de risco e vulnerabilidade social. Para a
presente pesquisa foi escolhido o projeto localizado no bairro Pirambu. O objetivo do
Projeto ABC Ã contribuir com aÃÃes sociais por meio do esporte, arte, lazer e cultura.
Busca retirar crianÃas e adolescentes da rua, proporcionando-lhes, educaÃÃo e
desenvolvimento de habilidades, para que possam se preparar para a inserÃÃo no
mercado de trabalho e conviver, harmoniosamente em sociedade. A opÃÃo por este
estudo se deveu ao envolvimento da pesquisadora, como servidora pÃblica estadual,
no trabalho de assessoramento do movimento popular no bairro do Pirambu, por
doze (12) anos, quando no exercÃcio da gerencia do Centro ComunitÃrio Luiza
TÃvora-Pirambu, vinculado à Secretaria do Trabalho e Desenvolvimento Social
(STDS), do Estado do CearÃ. Os resultados da pesquisa apresentam que 88% dos
participantes do Projeto ABC reconhecem que o mesmo foi propulsor de suas
existÃncias, entretanto detectou-se falha no assessoramento comprometendo uma
comunicaÃÃo eficaz entre representantes do CCCR e tÃcnicos da STDS. Foi
constatado um alto Ãndice de pobreza, contudo nÃo existe um trabalho consistente
junto Ãs famÃlias por falta de profissionais. Existe uma baixÃssima participaÃÃo em
grupos ou formas associativas, e sobre o conhecimento do sistema de gestÃo
somente 2% dos alunos, oito monitores e 7,3% dos representantes das famÃlias
conhecem que o sistema de gestÃo à a cogestÃo. Apresenta-se aqui, portanto, uma
reflexÃo sobre os alcances e limites da polÃtica da cogestÃo, a partir dos resultados
dos estudos que analisam a gestÃo como um todo, fazendo-o pela voz dos atores
implicados, e pelo significado das percepÃÃes dos participantes. / This work is a report of the evaluation results of the co-management politic of the
Cearà state government, having as end of the study, the actions developed by the
ABC Project â Pirambu, on 2009. The poverty effects in the suburbs of Fortaleza
took the Public Power to have wider actions in order to minimize the negatives
results of that problematic situation, adopting a partnership with the civil society.
Cearà state government, through the Secretary of Work and Social Development
(STDS), in association with civil society organizations, representatives of the
communities and Fortaleza suburbs, in a co-management system, went after the
participation and the shared responsibility, for the solution of the problems lived by
the community, implementing the ABC Project in 18 crucial points of the Fortaleza
suburbs, looking for serving children and youth, ranging from 6 to 17 years old, that
were on a risk situation and social vulnerability. For the present research was
chosen the project located on the Pirambu suburb. The objective of the ABC Project
is to contribute with social actions through sports, art, leisure and culture. It looks
forward to take off the children out of the streets, providing education and abilities
development, so they can prepare themselves to get into the labor market and
coexist harmoniously in the society. The choose of this research was due to the
involvement of the researcher, as a state social servant in the work of counseling of
the popular movement on the Pirambu suburb, for twelve (12) years, while in the
management of the Communitarian Center Luiza TÃvora-Pirambu, linked to the
Secretary of Work and Social Development (STDS), of Cearà state. The survey
results show that 88% of the Project ABC participants recognize that it was driver of
their stocks, however it was detected fault in advising compromising effective
communication between representatives of the CCCR and technicians STDS. It was
found a high rate of poverty, yet there is a consistent work with families for lack of
professionals. There is a very low participation in groups or forms of association, and
the knowledge management system, only 2% of students, eight monitors and 7.3%
of the representatives of the families know that the management system is the comanagement.
Itâs presented, hence, a reflexion about the scope and boundaries of
the co-management politic, starting from the research result that analyzed the
management as a whole, making it by the voice of the involved actors, and by of the
meaning of the participants perceptions.

Identiferoai:union.ndltd.org:IBICT/oai:www.teses.ufc.br:3297
Date26 March 2010
CreatorsAngela Maria Ferreira Moreira
ContributorsLea Carvalho Rodrigues, Paulo CÃsar de Almeida, Raimundo Elmo de Paula Vasconcelos JÃnior, Elza Maria Franco Braga
PublisherUniversidade Federal do CearÃ, Programa de PÃs-GraduaÃÃo em AvaliaÃÃo de PolÃticas PÃblicas, UFC, BR
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Formatapplication/pdf
Sourcereponame:Biblioteca Digital de Teses e Dissertações da UFC, instname:Universidade Federal do Ceará, instacron:UFC
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0035 seconds