Return to search

Rekonstrukce žst. Holešov / Holesov Station Reconstruction

The master’s thesis deals with upgrading of the Holešov railway station. The goal is to design a solution suitable for the capacity for a current traffic and valid legislation. Required are two boarding edges in the length of 130 meters enabling access to persons with reduced mobility and orientation, adjustments or renovation of a station throat triggered by insertion of platforms, maximizing line speed and design of railway superstructure and substructure design including drainage.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455458
Date January 2022
CreatorsLudvíková, Lilija
ContributorsŠmíd, Jaroslav, Říha, Tomáš
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0136 seconds