Return to search

Disassembly And Re-use Of Building Materials: A Case Study On Salvaged Timber Components

The objective of this study was to investigate the feasibility of using salvaged timber from deconstructed buildings in Turkey. The intention was to show that the re-use of &lsquo / waste&rsquo / materials, while decreasing the cost of construction also preserves the environment from wasteful and extensive use of natural resources. It is hoped that the findings of such a study will encourage professionals to use second hand timber components in Turkey. In order to deal with the waste problem and to save our planet the re-use of construction materials from economic, environmental, social, and historic points of views should be pursued. This research incorporated information about the re-use of timber, including ongoing projects around the world, as reported by the International Council for Research and Innovation in Building Construction (CIB) Task Group on Deconstruction (TG39), a local survey of individuals, organizations, and businesses that are related to the recycling and reuse of building materials. Local deconstruction works, recovery and re-use of timber elements and components were investigated on the basis of information obtained from the demolition contractors in Bentderesi locality in Ankara, a salvaged materials market.
iii
Moreover the study aimed to observe how used timber components are recovered from a demolition project. By observing the demolition of a building the author was able to determine the problems in recovering timber with the least damage. The findings of the investigation indicated that the architects and the building industry can play an important role to increase recovery rates and conditions of used timber components in construction, considerably. Instead of using nails for timber joints bolted connections should be preferred since they allow demounting and re-use with minimum damage during the deconstruction process. At the same time defects in timber due to extensive and unnecessary nailing can also be avoided. The decision on type of deconstruction, time and cost estimation, worker ability and sensitivity during disassembly influence the success of deconstruction. Tools and machinery used both on the work site and in the UBMs selling area have direct effects on the condition of recovered materials.

Identiferoai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/1042431/index.pdf
Date01 December 2003
CreatorsIsik, Aydin
ContributorsElias-ozkan, Soofia Tahira
PublisherMETU
Source SetsMiddle East Technical Univ.
LanguageEnglish
Detected LanguageEnglish
TypeM.S. Thesis
Formattext/pdf
RightsTo liberate the content for public access

Page generated in 0.0018 seconds