Return to search

Improved discrete cuckoo search for the resource-constrained project scheduling problem

Yes / An Improved Discrete Cuckoo Search (IDCS) is proposed in this paper to solve resource-constrained project scheduling problems (RCPSPs). The original Cuckoo Search (CS) was inspired by the breeding behaviour of some cuckoo species and was designed specifically for application in continuous optimisation problems, in which the algorithm had been demonstrated to be effective. The proposed IDCS aims to improve the original CS for solving discrete scheduling problems by reinterpreting its key elements: solution representation scheme, Lévy flight and solution improvement operators. An event list solution representation scheme has been used to present projects and a novel event movement and an event recombination operator has been developed to ensure better quality of received results and improve the efficiency of the algorithm. Numerical results have demonstrated that the proposed IDCS can achieve a competitive level of performance compared to other state-of-the-art metaheuristics in solving a set of benchmark instances from a well-known PSPLIB library, especially in solving complex benchmark instances. / Partially funded by the Innovate UK project HARNET – Harmonised Antennas, Radios and Networks under contract no. 100004607.

Identiferoai:union.ndltd.org:BRADFORD/oai:bradscholars.brad.ac.uk:10454/16905
Date03 May 2018
CreatorsBibiks, Kirils, Hu, Yim Fun, Li, Jian-Ping, Pillai, Prashant, Smith, A.
Source SetsBradford Scholars
LanguageEnglish
Detected LanguageEnglish
TypeArticle, Accepted manuscript
RightsCrown Copyright © 2018 Published by Elsevier B.V. All rights reserved. Reproduced in accordance with the publisher's self-archiving policy. This manuscript version is made available under the CC-BY-NC-ND 4.0 license.

Page generated in 0.0019 seconds