The diploma thesis deals with the construction project of the new building of the primary school in Bobrová. The main goal of the thesis is to propose a suitable implementation procedure in relation to the specific place of the site. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the construction realization, material resources plan, technical report, time schedule and financial plan of the main object and also with the situation of the construction. It focuses in detail on the stage of earthworks, including the reinforcement of the walls of the building pit using soil nailing. For this stage a technological regulation and a control and test plan have been developed.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:372114 |
Date | January 2018 |
Creators | Kudiovský, Filip |
Contributors | Kratochvílová, Erika, Šlanhof, Jiří |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0021 seconds