Reactive repair of a disrupted schedule is a better alternative to total rescheduling, as the latter is a time consuming process and also results in shop floor nervousness. The schedule repair heuristics reported in the literature generally address only machine breakdown. This paper presents a modified Affected Operations Rescheduling (mAOR) approach, which deals with many of the disruptions that are frequently encountered in a job shop. The repair of these disruptions has been decomposed into four generic repair actions that can be applied singularly or in combination. These generic repair actions are evaluated through a simulation study with the performance measures of efficiency and stability. The results indicate the effectiveness of the mAOR heuristic in dealing with typical job shop disruptions. / Singapore-MIT Alliance (SMA)
Identifer | oai:union.ndltd.org:MIT/oai:dspace.mit.edu:1721.1/3744 |
Date | 01 1900 |
Creators | Raheja, Amritpal Singh, Reddy, K. Rama Bhupal, Subramaniam, Velusamy |
Source Sets | M.I.T. Theses and Dissertation |
Language | en_US |
Detected Language | English |
Type | Article |
Format | 989442 bytes, application/pdf |
Relation | Innovation in Manufacturing Systems and Technology (IMST); |
Page generated in 0.0021 seconds